Process Route
DRIIF
Timeline
Operating since 2005
Emissions
2025
0.22 Mt CO₂e
1.90 t CO₂e per tonne of steel
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
96
DRI
232
Pelletising
1,400
Iron Units
Steel Units
IF
unknown IF (4)operating
IF
unknown IF (5)announced
IF
unknown IF (6)announced
EAF
unknown EAF (1)announced
EAF
unknown EAF (2)announced
IF
unknown IF (1)mothballed
IF
unknown IF (2)mothballed
IF
unknown IF (3)operating
Inputs & Energy
Power 16 MW CPP (8 MW WHRB-based; 8 MW FBC); 3 x 100KW Solar Power
Met coal SECL Mines
Steel Products
bar, coil, rounds, wire rod
Ownership
Owner Crest Steel and Power Pvt Ltd
Parent Atha Group [47.5%]; Ghanashyam Misra & Sons Pvt Ltd [47.5%]
Workforce 2,500 employees
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Mangatta
Asia Pacific
India
21.1903°, 81.1992°