Skip to content

JSOL Angul steel plant

operating

Jindal Nagar, Asia Pacific, India

GEM wiki

Process Route

BFBOF

Timeline

Announced2021
Operating2025

Emissions

2025

5.19 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

3,000

BOF

3,000

Blast Furnace

4,600

Sinter

11,500

Coking

5,170

Pelletising

26,000

Iron Units

BF
unknown BF (1)operating
4,600 ttpa5499 m³CISDIwiki
BF
unknown BF (2)announced
4,800 ttpa6000 m³wiki
BF
unknown BF (3)announced
4,600 ttpa5400 m³wiki
DRI
unknown DRI (1)construction
2,000 ttpawaste gas recovery (coke oven) · capablewiki
DRI
unknown DRI (2)announced
2,700 ttpawaste gas recovery (coke oven) · capablewiki
DRI
unknown DRI (3)announced
2,700 ttpawaste gas recovery (coke oven) · capablewiki

Steel Units

EAF
unknown EAF (1)announced
2,459 ttpa250 twiki
EAF
unknown EAF (2)announced
3,541 ttpa360 twiki
BOF
unknown BOF (1)construction
3,300 ttpawiki
BOF
unknown BOF (2)operating
3,000 ttpawiki
BOF
unknown BOF (3)announced
3,136 ttpawiki
BOF
unknown BOF (4)announced
3,764 ttpawiki

Inputs & Energy

Power 550 MW Gas-fired CPP

Iron ore JSPL TRB Mine (P100000128505)

Met coal Mozambique, Australia and Canada

Steel Products

wire rod

Ownership

Owner Jindal Steel Odisha Ltd

Parent Jindal Steel Limited Ltd [100.0%]

Workforce 9,400 employees

Country Context

India crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.