Process Route
DRIEAF
Timeline
Operating since 1924
Emissions
2025
0.43 Mt CO₂e
1.00 t CO₂e per tonne of steel
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
600
EAF
600
DRI
384
Iron Units
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power 60 mw cogeneration plant
Steel Products
billet, wire rod
Ownership
Owner Scaw Metals Group Pty Ltd
Parent Barnes South Palace Holdings Pty Ltd [74.0%]; unknown [26.0%]
Workforce 2,000 employees
Country Context
South Africa crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Germiston
Africa
South Africa
-26.2733°, 28.1638°