Process Route
EAF
Timeline
Operating1912
Retired2025
Emissions
2025
0.03 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
825
EAF
825
Steel Units
EAF
unknown EAF (1)retired
Steel Products
bar, billet
Ownership
Owner Novasco BV
Parent Greybull Capital
Workforce 450 employees
Country Context
France crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Hagondange
Europe
France
49.2415°, 6.1526°