Skip to content

Shri Bajrang Power & Ispat Tilda steel plant

operating

Tilda, Asia Pacific, India

ISO 14001
GEM wiki

Process Route

DRISteel other/unspecified

Timeline

Announced2010
Operating2013

Emissions

2025

0.83 Mt CO₂e

1.90 t CO₂e per tonne of steel

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

500

DRI

600

Sinter

1,000

Coking

500

Pelletising

1,400

Iron Units

BF
unknown BF (1)announced
550 ttpawiki
BF
unknown BF (2)announced
580 ttpa550 m³wiki
DRI
unknown DRI (1)operating
150 ttpawiki
DRI
unknown DRI (2)operating
150 ttpawiki
DRI
unknown DRI (3)operating
150 ttpawiki
DRI
unknown DRI (4)operating
150 ttpawiki
DRI
unknown DRI (5)announced
165 ttpawiki
DRI
unknown DRI (6)announced
165 ttpawiki

Steel Units

BOF
unknown BOF (1)announced
550 ttpawiki
BOF
unknown BOF (2)announced
550 ttpawiki

Inputs & Energy

Power 100 MW Captive Power Plant

Met coal South Eastern Coal Field Limited

Steel Products

coil, plate

Ownership

Owner Shri Bajrang Power and Ispat Ltd

Parent Banka Finance & Securities Pvt Ltd [15.9%]; Atlanta Securities Pvt Ltd [15.6%]; natural person(s) [6.3%]; Sukanya Merchandise Pvt Ltd [5.5%]; Bonus Dealcom Pvt Ltd [5.5%]

Country Context

India crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.