Process Route
DRIIF
Timeline
Announced2021
Operating2024
Emissions
2025
0.7 Mt CO₂e
1.90 t CO₂e per tonne of steel
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
420
DRI
420
Sinter
1,092
Coking
500
Pelletising
1,200
Iron Units
BF
unknown BF (1)announced
DRI
unknown DRI (1)operating
210 ttpawiki
DRI
unknown DRI (2)operating
210 ttpawiki
DRI
unknown DRI (3)announced
210 ttpawiki
DRI
unknown DRI (4)announced
210 ttpawiki
DRI
unknown DRI (5)announced
210 ttpawiki
DRI
unknown DRI (6)announced
210 ttpawiki
DRI
unknown DRI (7)announced
210 ttpawiki
DRI
unknown DRI (8)announced
210 ttpawiki
Steel Units
EAF
unknown EAF (1)announced
BOF
unknown BOF (1)announced
525 ttpawiki
IF
unknown IF (1)operating
IF
unknown IF (10)announced
IF
unknown IF (11)announced
IF
unknown IF (12)announced
IF
unknown IF (13)announced
IF
unknown IF (14)announced
IF
unknown IF (15)announced
IF
unknown IF (16)announced
IF
unknown IF (17)announced
IF
unknown IF (18)announced
IF
unknown IF (2)operating
IF
unknown IF (3)operating
IF
unknown IF (4)operating
IF
unknown IF (5)operating
IF
unknown IF (6)operating
IF
unknown IF (7)announced
IF
unknown IF (8)announced
IF
unknown IF (9)announced
Inputs & Energy
Power 57.5 MW WHRB from DRI and Coke Oven; 15 MW CFBC Boiler
Iron ore Odisha, Jharkhand, Chhattisgarh
Met coal Jharkhand, Odisha, West Bengal, and Imprted
Steel Products
angle, bar
Ownership
Owner Shyam Steel Industries Ltd
Parent Shyam Steel Industries Ltd [100.0%]
Workforce 8,000 employees
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Raghunathpur
Asia Pacific
India
23.5902°, 86.7246°