Process Route
EAF
Timeline
Announced2023
Construction2023
Operating2025
Emissions
2025
0.031 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
544
EAF
544
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power Green & Clean Power LLC (GCP) will construct 105-megawatt solar installation and a 160 megawatt-hour battery energy storage system.
Steel Products
rebar
Ownership
Owner Hybar LLC
Parent Green & Clean Holdings LLC [100.0%]
Workforce 140 employees
Country Context
United States crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Osceola
North America
United States
35.6868°, -89.9620°