Skip to content

Shandong Iron and Steel Co Ltd Laiwu Branch Aishan Street

operating

Asia Pacific, China

ISO 14001ISO 50001
GEM wiki

Process Route

BFBOF

Timeline

Announced2018
Operating2021

Emissions

2025

6.32 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

3,850

BOF

3,850

Blast Furnace

3,040

Iron Units

BF
BF 1operating
3,040 ttpa3800 m³wiki
BF
BF 2cancelled
3,040 ttpa3800 m³wiki

Steel Units

BOF
unknown BOF (1)cancelled
1,150 ttpawiki
BOF
unknown BOF (2)cancelled
1,150 ttpawiki
BOF
unknown BOF (3)operating
1,150 ttpawiki
BOF
unknown BOF (4)operating
1,350 ttpawiki
BOF
unknown BOF (5)operating
1,350 ttpawiki

Steel Products

sections, plate, strip, bar, special

Ownership

Owner Shandong Iron and Steel Co Ltd

Parent Shandong Iron and Steel Co Ltd [100.0%]

Workforce 14,822 employees

Country Context

China crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.