Process Route
EAF
Timeline
Operating since 2007
Emissions
2025
0.16 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
720
EAF
720
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power Photovoltaic Power Generation
Steel Products
billet, coil
Ownership
Owner Fujian Fuxin Special Steel Co Ltd
Parent Tianlong Investment Co Ltd [58.3%]; Huayang Investment (Hong Kong) Ltd [41.6%]
Workforce 1,413 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Zhangzhou
Asia Pacific
China
24.4724°, 117.9488°