Process Route
DRIIF
Timeline
Operating since 2003
Emissions
2025
0.18 Mt CO₂e
1.90 t CO₂e per tonne of steel
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
110
DRI
72
Iron Units
Steel Units
IF
unknown IF (2)operating
IF
unknown IF (3)operating
IF
unknown IF (4)operating
IF
unknown IF (5)announced
IF
unknown IF (6)announced
IF
unknown IF (7)announced
IF
unknown IF (8)announced
IF
unknown IF (1)operating
Inputs & Energy
Power 10 MW CPP (4 MW WHRB; 6 MW AFBC; Proposed to expand to 70 MW CPP (2x8 MW WHRB and 2x22 MW AFBC))
Iron ore Joda
Met coal Imported via Paradip port
Steel Products
billet, bar
Ownership
Owner Yazdani Steel and Power Ltd
Parent Serajuddin & Co
Workforce 519 employees
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Kalinganagar
Asia Pacific
India
20.9283°, 86.0366°