Process Route
EAF
Timeline
Operating since 1980
Emissions
2025
0.04 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
730
EAF
730
Production
Crude steel production: 548 ttpa (2024)
Steel Units
EAF
unknown EAF (1)operating
Steel Products
billet, beam, bar
Ownership
Owner Gerdau Ameristeel Corp
Parent Gerdau SA [98.2%]
Workforce 637 employees
Country Context
United States crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Monroe
North America
United States
41.8942°, -83.3587°