Process Route
EAF
Timeline
Construction1974
Operating1979
Emissions
2025
0.039 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
730
EAF
730
Steel Units
EAF
unknown EAF (1)operating
Steel Products
square, rounds, hexagon bar, flat, slab, ingot, billet, bloom, hot rolled
Ownership
Owner Asil Celik Sanayi ve Ticaret AŞ
Parent small shareholder(s) [21.7%]; Parsan Makina Parçaları Sanayi AŞ [20.1%]; Güriş Inşaat ve Muhendislik AŞ [19.5%]; Omtaş Otomotiv Transmisyon Aksamı Sanayi ve Ticaret AŞ [5.5%]; Diler Holding AŞ
Workforce 361 employees
Country Context
Türkiye crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Orhangazi
Europe
Türkiye
40.4275°, 29.2701°