Process Route
EAF
Timeline
Operating since 2010
Emissions
2024
0.064 Mt CO₂e
0.10 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,000
EAF
2,000
Steel Units
EAF
unknown EAF (1)mothballed
Inputs & Energy
Power Baştuğ Transformer Center
Steel Products
bloom, billet, beam, rebar
Ownership
Owner Tosyalı Holding AŞ
Parent Tosyalı Holding AŞ [100.0%]
Workforce 770 employees
Country Context
Türkiye crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Toprakkale
Europe
Türkiye
37.0165°, 36.0951°