Process Route
EAF
Timeline
Construction2018
Operating2020
Emissions
2025
0.053 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,000
EAF
1,000
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power plans to build a 3.6 mwe solar power plant (announced 2023), plans to build 30 mw solar plant (announced 2025)
Steel Products
angle, round bar, bar, beam, channel, billet
Ownership
Owner Mescier Demir Celik AŞ
Parent Mescier Demir Celik AŞ [100.0%]
Workforce 499 employees
Country Context
Türkiye crude steel production (USGS). Plant line shows nominal capacity, not output.