Process Route
EAF
Timeline
Operating since 1987
Emissions
2025
0.24 Mt CO₂e
0.12 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
3,100
EAF
3,100
Steel Units
Inputs & Energy
Power İzdemir Enerji power station (G113786)
Steel Products
rebar, sections, channel, bar, billet, flat, angle, h-beam, profile
Ownership
Owner Izmir Demir Celik Sanayi AŞ
Parent Izmir Demir Celik Sanayi AŞ [100.0%]
Workforce 2,010 employees
Country Context
Türkiye crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Aliağa
Europe
Türkiye
38.7396°, 26.9291°