Process Route
EAF
Timeline
Operating since 1987
Emissions
2025
0.29 Mt CO₂e
0.10 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
4,500
EAF
4,500
Steel Units
Inputs & Energy
Power 54 MW cogeneration power plant; 240 MW Aliaga Habas power station; 800 MW natural gas combined cycle power plant
Steel Products
wire rod, bar, billet, coil, slab
Ownership
Owner Habas Industrial and Medical Gases Production Industries AŞ
Parent Habas Industrial and Medical Gases Production Industries AŞ [100.0%]
Workforce 1,449 employees
Country Context
Türkiye crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Aliağa
Europe
Türkiye
38.7515°, 26.9502°