Process Route
EAF
Timeline
Operating since 1995
Emissions
2025
0.13 Mt CO₂e
0.18 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,500
EAF
1,500
Production
Crude steel production: 530 ttpa (2023)
Steel Units
EAF
unknown EAF (1)operating
Steel Products
coil, hot rolled
Ownership
Owner G J Steel PCL
Parent G J Steel PCL [100.0%]
Workforce 804 employees
Country Context
Thailand crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Sriracha
Asia Pacific
Thailand
13.0547°, 101.0788°