Process Route
EAF
Timeline
Construction1966
Operating1970
Emissions
2025
0.17 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
900
EAF
900
Steel Units
EAF
unknown EAF (1)operating
Steel Products
pipe, billet
Ownership
Owner Volzhskiy Trubnyi Zavod JSC
Parent Trubnaya Metallurgicheskaya Kompaniya PJSC [100.0%]
Workforce 10,000 employees
Country Context
Russia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Volzhskiy
Eurasia
Russia
48.8043°, 44.7941°