Process Route
EAF
Timeline
Construction2008
Operating2014
Emissions
2025
0.036 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
664
EAF
664
Steel Units
EAF
unknown EAF (1)operating
Steel Products
rebar, round bar, billet, square bar, angle, hexagon bar
Ownership
Owner UMK-Stal LLC
Parent Nokomis Select Inc [33.0%]; Tretiy Kod CJSC [32.8%]; Satelait JSC [17.7%]; Assets-M JSC [17.0%]
Workforce 1,200 employees
Country Context
Russia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Tyumen
Eurasia
Russia
57.1093°, 65.6686°