Process Route
EAF
Timeline
Operating since 1934
Emissions
2025
0.052 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
950
EAF
950
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power modular thermal power station
Steel Products
billet, pipe, cylinder
Ownership
Owner Chelyabinskiy Truboprokatnyi Zavod JSC
Parent Trubnaya Metallurgicheskaya Kompaniya PJSC [100.0%]
Workforce 7,485 employees
Country Context
Russia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Pervouralsk
Eurasia
Russia
56.9021°, 59.9922°