Skip to content

Amurstal steel plant

operating

Komsomolsk-on-Amur, Eurasia, Russia

GEM wiki

Process Route

EAF

Timeline

Announced1935
Construction1936
Operating1942

Emissions

2025

0.12 Mt CO₂e

0.08 t CO₂e per tonne of steel

Typical EAF route: 0.5–0.7 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

1,150

EAF

1,150

Production

Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.

Iron Units

DRI
unknown DRI (1)cancelled

Steel Units

EAF
EAF 1mothballed
1,000 ttpa100 twiki
EAF
EAF 2operating
1,150 ttpa125 tConcastwiki
EAF
unknown EAF (1)cancelled
850 ttpawiki

Steel Products

ingot, wire rod, rebar, bar, billet, round bar, wire, angle

Ownership

Owner Amurstal LLC

Parent Armada JSC [100.0%]

Workforce 2,277 employees

Country Context

Russia crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.