Process Route
EAF
Timeline
Announced1935
Construction1936
Operating1942
Emissions
2025
0.12 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,150
EAF
1,150
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
DRI
unknown DRI (1)cancelled
Steel Units
Steel Products
ingot, wire rod, rebar, bar, billet, round bar, wire, angle
Ownership
Owner Amurstal LLC
Parent Armada JSC [100.0%]
Workforce 2,277 employees
Country Context
Russia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Komsomolsk-on-Amur
Eurasia
Russia
50.5631°, 136.9764°