Skip to content

ArcelorMittal Dąbrowa Górnicza steel plant

operating

Dabrowa Gornicza, Europe, Poland

ISO 14001ISO 50001ResponsibleSteel
GEM wiki

Process Route

BFBOF

Timeline

Operating since 1976

Emissions

2025

6.87 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

5,001

BOF

5,001

Blast Furnace

2,300

Production

Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.

Iron Units

BF
BF 2operating
2,300 ttpa3200 m³ · relined 2023wiki
BF
BF 3mothballed
2,200 ttpa3200 m³wiki

Steel Units

BOF
BOF 1operating
1,667 ttpaPrimetals Technologieswiki
BOF
BOF 2operating
1,667 ttpaPrimetals Technologieswiki
BOF
BOF 3operating
1,667 ttpaPrimetals Technologieswiki

Inputs & Energy

Power ZW Nowa (150-megawatt coal and heat plant)

Met coal ArcelorMittal Kraków steel plant, which has been closed, but continued to operate coke ovens.

Steel Products

wire rod, rail, sections, coke, piling

Ownership

Owner ArcelorMittal Poland SA

Parent ArcelorMittal SA [100.0%]

Workforce 8,800 employees

Country Context

Poland crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.