Process Route
EAF
Timeline
Construction2010
Operating2012
Emissions
2025
0.056 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
450
EAF
450
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
BF
unknown BF (1)announced
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power 70 MW installed capacity; 2.25 MW Solar power plant (proposed)
Iron ore Mines in Khyber Pakhtunkwa
Steel Products
billet, rebar, bar
Ownership
Owner Agha Steel Industries Ltd
Parent Agha Steel Industries Ltd [100.0%]
Country Context
Pakistan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Karachi
Asia Pacific
Pakistan
24.8419°, 67.3102°