Skip to content

Ann Joo Integrated Steel Penang plant

operating

Prai, Asia Pacific, Malaysia

ISO 14001
GEM wiki

Process Route

BFEAF

Timeline

Operating since 2007

Emissions

2025

0.71 Mt CO₂e

0.89 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

900

EAF

900

Blast Furnace

500

Iron Units

BF
unknown BF (1)operating
500 ttpa450 m³Tangshan Iron & Steel International Engineering Technology Co Ltdwiki

Steel Units

EAF
unknown EAF (1)operating
900 ttpa75 twiki

Inputs & Energy

Power 3.3 megawatt-peak (MWp) rooftop solar photovoltaic (PV) system, off-gas produced from the BF is directed to the Top Gas Pressure Recovery Turbine

Iron ore Redstar Capital and Aqua Orion

Steel Products

billet, pig iron, rebar, wire rod

Ownership

Owner Ann Joo Integrated Steel Sdn Bhd

Parent Ann Joo Resources Bhd [100.0%]

Workforce 663 employees

Explore