Process Route
EAF
Timeline
Operating since 1993
Emissions
2025
0.2 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,050
EAF
1,050
Steel Units
EAF
unknown EAF (1)operating
Steel Products
billet, wire rod, sections, bar
Ownership
Owner Eden Flame Sdn Bhd
Parent Green Esteel Pte Ltd [100.0%]
Explore
Location
Pasir Gudang
Asia Pacific
Malaysia
1.4515°, 103.9173°