Process Route
BFBOFDRIEAFIron other/unspecified
Timeline
Announced1967
Construction1967
Operating1973
Emissions
2025
22.2 Mt CO₂e
1.88 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
18,758
EAF
1,357
BOF
17,401
Blast Furnace
12,900
DRI
9
Coking
1,500
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
BF
BF 3operating
BF
BF 4operating
BF
BF 1mothballed
BF
BF 2operating
DRI
HyREX demonstation plantannounced
DRI
pilot HyREX plantoperating
DRI
unknown DRI (2)announced
Steel Units
EAF
unknown EAF (1)announced
EAF
unknown EAF (2)operating
EAF
unknown EAF (3)operating
BOF
unknown BOF (1)operating
883 ttpawiki
BOF
unknown BOF (2)operating
2,769 ttpawiki
BOF
unknown BOF (3)operating
BOF
unknown BOF (4)operating
2,769 ttpawiki
BOF
unknown BOF (5)operating
BOF
unknown BOF (6)operating
2,721 ttpawiki
BOF
unknown BOF (7)operating
2,721 ttpawiki
Inputs & Energy
Iron ore Imported from Australia (Pilbara iron ore)
Met coal Tanoma coal mine
Steel Products
galvanized, wire rod, plate, cold rolled, hot rolled
Ownership
Owner POSCO Holdings Inc
Parent POSCO Holdings Inc [100.0%]
Workforce 6,920 employees
State ownership Partial
Country Context
South Korea crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Pohang
Asia Pacific
South Korea
36.0093°, 129.3945°