Process Route
EAF
Timeline
Operating since 1978
Emissions
2025
0.03 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
500
EAF
500
Production
Crude steel production: 446 ttpa (2020)
Steel Units
EAF
unknown EAF (1)operating
Steel Products
shapes, wire rod, rail, rebar, bar
Ownership
Owner Godo Steel Ltd
Parent Godo Steel Ltd [100.0%]
Workforce 241 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Himeji
Asia Pacific
Japan
34.7831°, 134.6694°