Process Route
EAF
Timeline
Announced1992
Construction1994
Operating1995
Emissions
2025
0.048 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
800
EAF
800
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power 2 MW Solar power plant (began in 2021-02)
Steel Products
sheet, channel, i-beam, h-beam, beam
Ownership
Owner Tokyo Steel Manufacturing Co Ltd
Parent Tokyo Steel Manufacturing Co Ltd [100.0%]
Workforce 257 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Utsunomiya
Asia Pacific
Japan
36.5404°, 139.9931°