Process Route
EAF
Timeline
Announced1960
Construction1960
Operating1962
Emissions
2025
0.043 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
708
EAF
708
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
Inputs & Energy
Power 750 kW Solar power plant (began in 2021-07)
Steel Products
rebar, sheet, coil, channel, i-beam, h-beam, beam
Ownership
Owner Tokyo Steel Manufacturing Co Ltd
Parent Tokyo Steel Manufacturing Co Ltd [100.0%]
Workforce 257 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Kurashiki
Asia Pacific
Japan
34.5151°, 133.7455°