Process Route
EAF
Timeline
Construction1970
Operating1971
Emissions
2025
0.041 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
678
EAF
678
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
Inputs & Energy
Power 800 kW solar power plant (began in 2021-02)
Steel Products
i-beam, piling, h-beam, plate
Ownership
Owner Tokyo Steel Manufacturing Co Ltd
Parent Tokyo Steel Manufacturing Co Ltd [100.0%]
Workforce 257 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Kitakyushu
Asia Pacific
Japan
33.8814°, 130.7560°