JFE West Japan Works (Kurashiki) steel plant
operatingKurashiki, Asia Pacific, Japan
ISO 14001
GEM wikiProcess Route
BFBOF
Timeline
Construction1961
Operating1967
Emissions
2025
12.8 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,000
BOF
2,000
Blast Furnace
7,600
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
EAF
unknown EAF (1)announced
BOF
unknown BOF (1)operating
1,000 ttpawiki
BOF
unknown BOF (2)operating
1,000 ttpawiki
BOF
unknown BOF (3)operating pre-retirement
1,000 ttpawiki
BOF
unknown BOF (4)operating pre-retirement
2,333 ttpawiki
BOF
unknown BOF (5)operating pre-retirement
2,333 ttpawiki
BOF
unknown BOF (6)operating pre-retirement
2,333 ttpawiki
Inputs & Energy
Iron ore Australia, Brazil and India
Steel Products
wire rod, rail, sheet, plate, coated, bar, pipe, piling, profile
Ownership
Owner JFE Steel Corp
Parent JFE Holdings Inc [100.0%]
Workforce 5,730 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Kurashiki
Asia Pacific
Japan
34.5012°, 133.7221°