Process Route
EAF
Timeline
Operating since 1962
Emissions
2025
0.09 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,500
EAF
1,500
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power hydro, wind and solar from Chubu Electric Power Miraizu Co., Ltd.
Steel Products
forged, wire, strip
Ownership
Owner Daido Steel Co Ltd
Parent Daido Steel Co Ltd [100.0%]
Workforce 3,878 employees
Country Context
Japan crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Tokai
Asia Pacific
Japan
35.0164°, 136.8647°