Process Route
EAFIF
Timeline
Operating since 2005
Emissions
2025
0.97 Mt CO₂e
0.87 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,600
EAF
1,000
Sinter
2,000
Pelletising
1,800
Iron Units
DRI
unknown DRI (1)announced
1,200 ttpawiki
Steel Units
Inputs & Energy
Iron ore Zaker iron ore mine
Steel Products
billet, rebar, angle, channel, beam
Ownership
Owner West Alborz Steel Co
Parent West Alborz Steel Co [100.0%]
Country Context
Iran crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Abhar
Middle East
Iran
36.1196°, 49.3063°