Process Route
EAF
Timeline
Operating since 2001
Emissions
2025
0.64 Mt CO₂e
0.91 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
733
EAF
733
Pelletising
2,000
Iron Units
DRI
unknown DRI (1)announced
Steel Units
Inputs & Energy
Power 230 KW power substation, 53-kilometer power transmission line
Steel Products
ingot, rebar, sections, bar
Ownership
Owner Natanz Steel Co
Parent Natanz Steel Co [100.0%]
Workforce 750 employees
Country Context
Iran crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Natanz
Middle East
Iran
33.4286°, 51.9823°