Process Route
DRIIF
Timeline
Operating since 2002
Emissions
2025
0.64 Mt CO₂e
1.90 t CO₂e per tonne of steel
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
385
DRI
375
Sinter
900
Pelletising
1,250
Production
Ironproduction, GEM-compiled (Global Iron & Steel Tracker).
Iron Units
Steel Units
IF
unknown IF (1)operating
IF
unknown IF (10)announced
IF
unknown IF (11)announced
IF
unknown IF (12)announced
IF
unknown IF (13)announced
IF
unknown IF (14)announced
IF
unknown IF (15)announced
IF
unknown IF (16)announced
IF
unknown IF (2)operating
IF
unknown IF (3)operating
IF
unknown IF (4)operating
IF
unknown IF (5)operating
IF
unknown IF (6)operating
IF
unknown IF (7)operating
IF
unknown IF (8)operating
IF
unknown IF (9)operating
Inputs & Energy
Power 45 MW Captive Power plant
Steel Products
structural, pellets, sponge iron, bar, billet
Ownership
Owner MSP Steel & Power Ltd
Parent MSP Steel & Power Ltd [100.0%]
Workforce 1,073 employees
State ownership Partial
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Raigarh
Asia Pacific
India
21.8767°, 83.5545°