Skip to content

Jindal Stainless Jajpur steel plant

operating

Kalinganagar, Asia Pacific, India

ISO 14001ISO 50001
GEM wiki

Process Route

BFEAF

Timeline

Announced2003
Operating2011

Emissions

2025

1.07 Mt CO₂e

0.67 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

2,200

EAF

2,200

Blast Furnace

2,000

Coking

430

Production

Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.

Iron Units

BF
BF 1operating
2,000 ttpa2307 m³Paul Wurthwiki
BF
unknown BF (1)announced
840 ttpa720 m³wiki

Steel Units

EAF
unknown EAF (1)operating
550 ttpa100 tSMS Demagwiki
EAF
unknown EAF (2)operating
550 ttpa100 twiki
EAF
unknown EAF (3)operating
1,100 ttpawiki
EAF
unknown EAF (4)announced
647 ttpa110 twiki
IF
unknown IF (1)announced
176 ttpa30 twiki
IF
unknown IF (2)announced
176 ttpa30 twiki

Inputs & Energy

Power 2x 125 MW CPP

Iron ore Barbil/Joda/open market

Met coal JCL

Steel Products

slab, coil, plate

Ownership

Owner Jindal Stainless Ltd

Parent Jindal Stainless Ltd [100.0%]

Workforce 1,095 employees

Country Context

India crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.