Skip to content

JSW Utkal Steel Rajnagar plant

announced

Rajnagar, Asia Pacific, India

GEM wiki

Process Route

BFBOFDRI

Timeline

Announced2017
Construction2023
Operating2026

Capacity (ttpa)

Crude Steel

13,500

BOF

13,500

Blast Furnace

13,500

DRI

1,200

Sinter

5,775

Coking

3,000

Pelletising

16,000

Iron Units

BF
BF 1announced
4,500 ttpa5350 m³wiki
BF
BF 2announced
4,500 ttpa5350 m³wiki
BF
BF 3announced
4,500 ttpa5350 m³wiki
DRI
unknown DRI (1)announced
1,200 ttpawaste gas recovery (coke oven)wiki

Steel Units

BOF
unknown BOF (1)announced
3,500 ttpawiki
BOF
unknown BOF (2)announced
3,500 ttpawiki
BOF
unknown BOF (3)announced
3,500 ttpawiki
BOF
unknown BOF (4)announced
1,500 ttpawiki
BOF
unknown BOF (5)announced
1,500 ttpawiki

Inputs & Energy

Power JSW Utkal Steel power station Unit 1 - G115666, L104954 (300 MW)

Iron ore Joda-Barbil, Koira and Nayagarh mines

Met coal Imports possibly from Mozambique, Australia and Canada

Steel Products

wire rod, rebar, sheet, sections, plate, strip, electrical, coil

Ownership

Owner JSW Utkal Steel Ltd

Parent JSW Steel Ltd [100.0%]

State ownership Partial

Country Context

India crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).