Process Route
Timeline
Operating since 1971
Emissions
2025
1.67 Mt CO₂e
2.12 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,200
EAF
1,200
Blast Furnace
650
DRI
645
Sinter
1,000
Coking
500
Pelletising
1,200
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
Inputs & Energy
Power Two coal based captive power plants (25MW, began in 2001; 30MW, began in 2009); Two waste recovery captive power plants (30 MW DRI WHRB, began in 2012; 30MW Coke oven WHRB, began in 2013); Coal-gas hybrid captive power plant 15 MW
Iron ore Tata Steel Vijay-II Mine (P100000129405); Ghatkuri iron ore mine
Met coal Xstrata Coal Queensland Pvt. Ltd, Australia
Steel Products
wire rod
Ownership
Owner Tata Steel Ltd
Parent Tata Steel Ltd [100.0%]
Workforce 2,287 employees
State ownership Partial
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Jamshedpur
Asia Pacific
India
22.8129°, 86.0840°