JSW Steel Vijayanagar steel plant
operatingToranagallu, Asia Pacific, India
Process Route
Timeline
Operating since 1994
Emissions
2025
17.8 Mt CO₂e
1.92 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
11,899
EAF
1,500
BOF
10,399
Blast Furnace
8,500
DRI
1,200
Sinter
12,950
Coking
6,500
Pelletising
9,200
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
Inputs & Energy
Power JSW Vijayanagar Toranagallu power station; 860MW power plant in Vijaynagar consisting of 2 130MW units in SBU I (2000) and 2 300MW units in SBU II (2009), 76 MW captive power plant. Also recycles 96% of coke oven gas for power generation.
Iron ore Captive mines in Odisha and Karnataka
Steel Products
galvanized, wire rod, bar, cold rolled, special, hot rolled
Ownership
Owner JSW Steel Ltd
Parent JSW Steel Ltd [100.0%]
Workforce 929 employees
State ownership Partial
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Toranagallu
Asia Pacific
India
15.1804°, 76.6631°