JSW Steel Salem steel plant

operating

Pottaneri, Asia Pacific, India

ISO 14001ISO 50001ResponsibleSteel
GEM wiki

Process Route

BFBOF

Timeline

Announced1991
Construction1996
Operating1998

Emissions

2025

2.18 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

1,260

BOF

1,260

Blast Furnace

1,366

Sinter

1,235

Coking

500

Production

Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.

Iron Units

BF
BF 1operating
683 ttpa402 m³wiki
BF
BF 2operating
683 ttpa650 m³ · relined 2022wiki

Steel Units

BOF
BOF 1operating
640 ttpawiki
BOF
BOF 2operating
620 ttpawiki

Inputs & Energy

Power 3x 30MW CPP (More than 70% of captive power generation through waste heat)

Iron ore Captive mines in Odisha (unknown what percentage comes from here)

Met coal Imported

Steel Products

wire rod, square, bar, coil, flat, hot rolled

Ownership

Owner JSW Steel Ltd

Parent JSW Steel Ltd [100.0%]

Workforce 929 employees

State ownership Partial

Country Context

India crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.