Process Route
Timeline
Operating since 2005
Emissions
2025
7.89 Mt CO₂e
1.83 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
5,000
EAF
3,500
Blast Furnace
2,350
DRI
1,920
Coking
950
Pelletising
3,500
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
Inputs & Energy
Power Captive power plant (506 MW). Excess power generated is sold thorugh state power grid.
Iron ore Netrabandha iron ore mine
Met coal Indian and imported from South Africa
Steel Products
wire rod, sheet, pipe, billet, coil, pig iron, rounds, hot rolled, DRI
Ownership
Owner JSW Steel Ltd
Parent JSW Steel Ltd [100.0%]
Workforce 929 employees
State ownership Partial
Country Context
India crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Thelkoloi
Asia Pacific
India
21.7640°, 84.0225°