Process Route
EAF
Timeline
Announced1970
Construction1975
Operating1977
Emissions
2025
0.57 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
4,000
EAF
4,000
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
EAF
unknown EAF (1)operating
400 ttpawiki
EAF
unknown EAF (10)operating
400 ttpawiki
EAF
unknown EAF (2)operating
400 ttpawiki
EAF
unknown EAF (3)operating
400 ttpawiki
EAF
unknown EAF (4)operating
400 ttpawiki
EAF
unknown EAF (5)operating
400 ttpawiki
EAF
unknown EAF (6)operating
400 ttpawiki
EAF
unknown EAF (7)operating
400 ttpawiki
EAF
unknown EAF (8)operating
400 ttpawiki
EAF
unknown EAF (9)operating
400 ttpawiki
BOF
unknown BOF (1)announced
4,000 ttpawiki
Inputs & Energy
Power 1x150 MW Coal-Fired Power Plant
Steel Products
rod, bar, pipe, cold rolled, hot rolled, wire
Ownership
Owner PT Krakatau Steel (Persero) Tbk
Parent PT Krakatau Steel (Persero) Tbk [100.0%]
Workforce 5,497 employees
State ownership Partial
Country Context
Indonesia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Cilegon
Asia Pacific
Indonesia
-6.0070°, 106.0018°