Process Route
EAF
Timeline
Operating since 1994
Emissions
2025
0.52 Mt CO₂e
0.82 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
900
EAF
900
Production
Crude steel production: 791 ttpa (2021)
Steel Units
EAF
unknown EAF (1)operating
Steel Products
rebar
Ownership
Owner Ezz Steel Co
Parent Ezz Steel Co [100.0%]
Workforce 2,000 employees
Country Context
Egypt crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Sadat City
Africa
Egypt
30.3822°, 30.5630°