Process Route
BFBOF
Timeline
Operating1957
Idled2021
Retired2021
Emissions
2021
2.09 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
3,200
BOF
3,200
Blast Furnace
1,400
Sinter
3,000
Iron Units
Steel Units
Inputs & Energy
Iron ore Baharia mines, Ghorabi, El Hara, Nasser
Steel Products
cold rolled, rebar, strip, hot rolled
Ownership
Owner Egyptian Iron & Steel Co
Parent Egyptian Iron & Steel Co [100.0%]
State ownership Full
Country Context
Egypt crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Helwan
Africa
Egypt
29.7745°, 31.3120°