Skip to content

ArcelorMittal Eisenhüttenstadt steel plant

operating

Eisenhüttenstadt, Europe, Germany

ISO 14001ISO 50001ResponsibleSteel
GEM wiki

Process Route

BFBOF

Timeline

Operating since 1950

Emissions

2025

2.96 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

2,400

BOF

2,400

Blast Furnace

1,825

Sinter

2,900

Production

Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.

Iron Units

BF
BF 5Aoperating
1,825 ttpa1779 m³ · relined 2022Paul Wurth (parts); Saint-Gobain (parts)wiki
DRI
unknown DRI (1)cancelled
150 ttpawiki

Steel Units

EAF
unknown EAF (1)cancelled
1,200 ttpawiki
EAF
unknown EAF (2)cancelled
1,200 ttpawiki
BOF
unknown BOF (1)operating
1,200 ttpawiki
BOF
unknown BOF (2)operating
1,200 ttpawiki

Inputs & Energy

Power WindSeeG project

Steel Products

galvanized, plate, coated, cold rolled, hot rolled, slab

Ownership

Owner ArcelorMittal Eisenhüttenstadt GmbH

Parent ArcelorMittal SA [100.0%]

Workforce 2,700 employees

Country Context

Germany crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.