Process Route
EAF
Timeline
Construction2022
Operating2023
Emissions
2025
0.18 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
958
EAF
958
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power waste heat power generation&400 megawatts rooftop distributed photovoltaic
Steel Products
billet
Ownership
Owner Fujian Qingtuo New Material Co Ltd
Parent Shanghai Decent Investment (Group) Co Ltd [51.6%]; unknown [23.1%]; TSINGSHAN Holding Group Co Ltd [19.7%]; Zhejiang Qingshan Business Management Co Ltd [5.6%]
Workforce 152 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Ningde
Asia Pacific
China
26.7793°, 119.7679°