Skip to content

Liyang Baorun Steel Co Ltd

operating

Changzhou, Asia Pacific, China

ISO 50001
GEM wiki

Process Route

EAF

Timeline

Announced2021
Operating2023

Emissions

2025

0.55 Mt CO₂e

0.27 t CO₂e per tonne of steel

Typical EAF route: 0.5–0.7 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

2,760

EAF

2,760

Steel Units

EAF
unknown EAF (1)operating
920 ttpa120 twiki
EAF
unknown EAF (2)operating
920 ttpa120 twiki
EAF
unknown EAF (3)operating
920 ttpa120 twiki

Inputs & Energy

Power State Grid Jiangsu Electric Power Company

Ownership

Owner Liyang Baorun Steel Co Ltd

Parent Jiangsu Delong Nickel Industry Co Ltd [100.0%]

Workforce 178 employees

Country Context

China crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.