Process Route
BFBOFEAF
Timeline
Operating since 2006
Emissions
2025
3.01 Mt CO₂e
1.64 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,260
EAF
360
BOF
1,900
Blast Furnace
1,820
Sinter
4,200
Iron Units
Steel Units
Steel Products
coil, wire, sheet, bar
Ownership
Owner Qinhuangdao Baigong Steel Co Ltd
Parent Tangshan Universal Industrial Development Co Ltd [100.0%]
Workforce 2,303 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Qinhuangdao
Asia Pacific
China
39.7488°, 118.8195°