Process Route
EAF
Timeline
Operating since 2010
Emissions
2025
0.22 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,500
EAF
1,500
Steel Units
EAF
unknown EAF (1)operating
1,500 ttpawiki
Inputs & Energy
Power Southern Power Grid North Bay Power Supply Bureau in Guangxi
Steel Products
cold rolled, coil, strip, hot rolled
Ownership
Owner Guangxi Wuzhou Jinhai Stainless Steel Co Ltd
Parent Guangdong Jinhai Brilliant Group Co Ltd [100.0%]
Workforce 931 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Wuzhou
Asia Pacific
China
23.5182°, 111.2355°