Process Route
BFBOFEAF
Timeline
Operating2012
Retirement announced2020
Retired2021
Emissions
2021
8.29 Mt CO₂e
1.85 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
6,190
EAF
360
BOF
5,830
Blast Furnace
6,240
Iron Units
Steel Units
Inputs & Energy
Power Self-owned Energy and Power Plant
Steel Products
sections, plate, strip, bar, special
Ownership
Owner Shandong Iron and Steel Co Ltd
Parent Shandong Iron and Steel Co Ltd [100.0%]
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Asia Pacific
China
36.0885°, 117.8505°